We provide downloadable documents such as user manuals, product datasheet, product brochures, product leaflets, etc.


Together with our agents and distributors, we provide convenient local service and quality after-sales maintenance service. The standard service provided is 5×8 (5 days a week, 8 hours a day) technical service support, providing customers with maintenance, repair and remote technical support services through phone and e-mail.

The FAQ section summarizes the solutions to some problems in the installation, configuration and use of New Rock hardware and software products.



We provide the latest trends of ICT, follow us on the industry news and master the latest cutting-edge technology!



(New Rock Technologies, Inc.) is a new generation of intelligent communication equipment and solution provider. We provide future-oriented intelligent communication products and services to customers such as telecom operators, governments, enterprises, etc.

Since the establishment 19 years ago, New Rock has always taken R&D as our core mission and insisted on independent innovation. New Rock has more than 80 certificates and honors, with 19 years of industry brand recognition and influence, and is the common choice of many customers!

New Rock has established a nationwide service system with Shanghai headquarters as the center and six branches or offices in Beijing, Guangzhou, Shenzhen, Shandong, Wuhan and Chengdu to provide customers with perfect pre-sales consultation and after-sales service.

Please leave your message for any needs, we will do our best to serve you!

Welcome to become New Rock partner! Hand in hand together to build a bright future!
News
Moving from a legacy PBX to an IP-PBX is not a single switch — it is a sequence of steps that must be planned so that no site goes dark. The goal is a migration where extensions, voicemail, trunks, and day-to-day calling all continue working through the transition. A clear checklist turns a risky cutover into a controlled move, and it is the same discipline whether you are moving one office or a whole multi-site business.
Start with a site survey: list every extension, every trunk, and every feature the current system provides. Map which extensions move to which new devices, and note anything the new system handles differently.
The survey is the step most often skipped, and skipping it is the most common cause of a rough first week. You cannot plan cutover without knowing exactly what is on the current system, and an incomplete inventory almost always surfaces as an unplanned problem on cutover night.
Plan the cutover around trunks, phones, and fallback. Decide which trunks move first, how phones are re-provisioned, and what happens if the new system is not ready on the planned night.
Keep a rollback plan: a way to restore the old system if the new one is not stable. A planned fallback is the difference between a controlled move and an outage that lasts until someone figures out what went wrong. Document the order of the cutover so anyone on the team can follow it on the night.
| Phase | What to do | Why it matters |
|---|---|---|
| Site survey | List all extensions, trunks, and features | You cannot plan what you have not inventoried |
| Mapping | Assign extensions to new devices | Keeps users on their familiar numbers |
| Cutover | Move trunks and phones in order | Controlled sequence avoids a dark site |
| Fallback | Keep a restore plan ready | Limits downtime if the new system stalls |
At Newrock, we recommend a phased migration over a big-bang switch. Move one site or one group of extensions at a time, keep the old system reachable during the transition window, and only cut over fully once the new system is stable in live use. A checklist that covers the site survey, the mapping, the ordered cutover, and the fallback plan keeps every step controlled — and it lets you learn from each phase before the next, so the risk stays contained. Communication with users about what changes and when is part of the plan too, so expectations match the move.
Going dark because the new system is not ready on cutover night. A site survey and a rollback plan are the two safeguards that prevent a long outage.
Phase it. Moving one site or one group of extensions at a time contains risk and lets you learn from each phase before the next.
Every extension, every trunk, and every feature the current system provides — you cannot plan cutover without a full inventory.
It depends on the size and number of sites. A phased approach over several nights is safer than a single big-bang switch.
A PBX migration succeeds on preparation, not on the cutover night. Do the site survey, map every extension, plan an ordered cutover, and keep a fallback ready — and the move stays controlled, with no site going dark and every phase containing its own risk. With a checklist in hand, the migration becomes a series of managed steps rather than a single risky switch.