

We provide downloadable documents such as user manuals, product datasheet, product brochures, product leaflets, etc.


Together with our agents and distributors, we provide convenient local service and quality after-sales maintenance service. The standard service provided is 5×8 (5 days a week, 8 hours a day) technical service support, providing customers with maintenance, repair and remote technical support services through phone and e-mail.

The FAQ section summarizes the solutions to some problems in the installation, configuration and use of New Rock hardware and software products.



We provide the latest trends of ICT, follow us on the industry news and master the latest cutting-edge technology!



(New Rock Technologies, Inc.) is a new generation of intelligent communication equipment and solution provider. We provide future-oriented intelligent communication products and services to customers such as telecom operators, governments, enterprises, etc.

Since the establishment 19 years ago, New Rock has always taken R&D as our core mission and insisted on independent innovation. New Rock has more than 80 certificates and honors, with 19 years of industry brand recognition and influence, and is the common choice of many customers!

New Rock has established a nationwide service system with Shanghai headquarters as the center and six branches or offices in Beijing, Guangzhou, Shenzhen, Shandong, Wuhan and Chengdu to provide customers with perfect pre-sales consultation and after-sales service.

Please leave your message for any needs, we will do our best to serve you!

Welcome to become New Rock partner! Hand in hand together to build a bright future!
News
An Avaya PBX migration is one of the most common legacy moves, and the hardest part is rarely the technology — it is keeping the transition invisible to users. The plan below breaks an Avaya migration into the stages that actually prevent downtime and the first-week problems that follow a bad cutover.
Before anything moves, inventory the current Avaya system: every extension, every trunk, every voicemail box, and every feature users depend on. Map each one to its replacement on the new system.
This inventory is what lets you plan a cutover you can actually execute. Extensions that users expect to keep, features that are easy to miss, and trunks that carry live traffic all need to be on the list.
Plan the cutover around trunks and phones, and keep a rollback path to the Avaya system if the new one is not stable on the planned night. Decide the order of the move and who is on call during it.
A planned fallback is the safeguard that keeps an Avaya migration from turning into an outage. Knowing you can restore the old system limits downtime to a controlled window rather than an open-ended one.
Move trunks and extensions in order, then re-provision phones. After the cutover, spend time on training — the first week after a migration is where most user frustration surfaces, and it is almost always a training issue, not a technology issue.
Clear, short training on the new dialing, voicemail, and transfer covers the everyday tasks that matter. Users who know the basics avoid the calls that flood the help desk in the first days.
The three stages at a glance:
| Stage | What to do | Why it matters |
|---|---|---|
| Inventory | List extensions, trunks, voicemail, features | You cannot plan what you have not inventoried |
| Plan | Order the cutover and set a rollback path | Keeps downtime to a controlled window |
| Move and train | Provision phones, then train users | Prevent first-week help-desk call floods |
At Newrock, we recommend a phased Avaya migration over a single big-bang switch. Move one site or one group at a time, keep the Avaya system reachable during the transition window, and only cut over fully once the new system is stable in live use. Treat the inventory and the rollback plan as the two non-negotiables — they are what turn an Avaya migration from a risky cutover into a controlled move that users barely notice.
Keeping the transition invisible to users. The technology is rarely the problem; the first-week frustration usually comes from a rushed cutover or missing training.
Yes. Keeping it reachable during the transition window limits downtime to a controlled window and gives you a rollback path if the new system is not stable.
Users not knowing the new dialing, voicemail, and transfer basics. Short, focused training prevents the first-week call flood.
Yes. Moving one site or group at a time contains risk and lets you learn from each phase before the next.
An Avaya migration succeeds on inventory, a planned cutover, and training. Inventory what you have, plan the move with a rollback path, move in order, then train users on the basics — and the transition stays invisible, with the first week smooth rather than chaotic. With the stages in order, an Avaya migration becomes a controlled move, not a risky switch.
Tel:021-61202700 / 52217917
Address:5/F Block B, Building 1, No.188 Pingfu Road, Xuhui District, Shanghai 200231, China
Copyright © New Rock Technologies, Inc. All Rights Reserved. 沪ICP备15008515号-1

